PROJECT OVERVIEW
New-Build Brick Slip Facade Construction
Bridgewater Wharf is a major residential development in Salford where UKR Facades delivered a £6m new-build facade package centred around a mechanically fixed brick slip system. UKR Facades’ scope included localised SFS repairs through to the installation of sheathing board, insulation, brick slip system and windows.
Delivered across a 78-week construction programme, the project included the installation of more than 700 windows alongside the wider facade works. Construction reached completion in December 2024, with the package delivered almost exclusively using MEWPs at the client’s request.
Client
Confidential
Duration
78 Weeks
Value
£6M
Completion
December 2024
SCOPE OF WORKS
An Integrated External Wall Package
The facade package brought together SFS repair works, followed by the installation of sheathing board, insulated panels and a mechanically fixed brick slip system as part of the building’s external envelope. More than 700 windows were also installed within the programme, creating a substantial coordinated scope across the residential development.
PROJECT GALLERY
Bridgewater Wharf in Detail