PROJECT CASE STUDY

Spectrum Apartments

Fire Safety Remediation · Salford

PROJECT OVERVIEW

Fire-Safety Remediation Across Eight Higher-Risk Buildings

Spectrum Apartments is a £15m fire-safety remediation project spanning eight residential Higher-Risk Buildings in Salford. UKR Facades was appointed to deliver extensive facade remediation works across the development, replacing multiple elements of the existing external wall systems to improve fire safety and compliance.

The three-year construction programme includes replacement cladding, insulated render, insulation, fire barriers, spandrel panels and decking. Alongside delivery, UKR produced the Stage 4 technical facade design in coordination with the appointed fire engineer, structural engineer and architect, supporting the project through Gateway 2 and into construction.

Client

Dandara Living

Duration

3 Years

Value

£15M

Completion

Ongoing

Aerial view of extensive scaffolding and facade works across Spectrum Apartments in Salford

SCOPE OF WORKS

Multi-System Facade Remediation

Spectrum Apartments involves remediation across eight residential buildings and a particularly varied range of existing facade systems. The works encompass replacement cladding, insulated render, insulation, fire barriers, spandrel panels and decking, bringing multiple specialist systems together within the wider remediation programme.

HardiePlank VL Cladding
Equitone Tectiva Cladding
Aluminium Rainscreen Cladding
Ryno Composite Decking
Wetherby Render
Rockwool Insulation
Siderise Fire Barriers
Y Wall Sheathing Board

TECHNICAL COORDINATION

Coordinating Stage 4 Design Across Eight HRBs

The Stage 4 technical facade design for Spectrum Apartments was developed by UKR Facades in close coordination with the project’s appointed fire engineer, structural engineer and architect, ensuring a robust and compliant solution ready for Gateway 2.

As part of the Gateway 2 process, UKR Facades also supported the client in developing the required supporting documentation covering health and safety, change control, construction control and mandatory occurrence reporting. The submission was successfully approved by the Building Safety Regulator on its first submission, allowing the project to progress into the three-year construction programme.